FEED

Front end engineering design. The FEED study is conducted after Conceptual Design, or the Feasibility Study. It includes basic engineering, focusing on project specific technical requirements and rough investment cost for the project. The FEED package is used as the basis for bidding the Execution Phase Contracts such as EPC or EPCI, and is used as the project design basis.